Greenfield 27

Location

Garner, NC

Date Completed

2023

Square Footage

260,000

Service Provided

Architecture

Landscape Architecture

Programming through CA Services

Located inside Garner Industrial Park, Greenfield 27 sits on a 27-acre lot adjacent to Interstate 40 and State Highway 70 and features three Class A industrial facilities totaling 260,000 square feet. The three-building campus is the latest and largest project completed by HagerSmith Design within the business park.

Greenfield 27

600 S. Greenfield Parkway comprises 160,380 square feet and features 32-foot clear heights, ESFR sprinkler systems, two grade-level doors, 32 dock high doors and 177 vehicle parking spots within the campus. Wake County Board of Alcoholic Beverage Control acquired the building to use as their new distribution headquarters in early 2024.

Greenfield 27

The 57,600 square foot 4101 Waterfield Drive and 44,800 square foot 4501 Waterfield Drive both offer ESFR sprinkler systems, 32-foot clear heights, 18 and 14 dock-high doors and a total of 190 parking spots. Both buildings are occupied by Acousti Engineering, Southern Staircase, and The Macomb Group.

Greenfield 27

Your Ideas, Our Expertise, Personalized Design

Our design process begins and ends with your vision in mind. We aim to be a part of your team and someone you want to work with every day. We empower and inform you throughout the process, working alongside you to customize every detail.